Sewer cleaning
Sewer cleaning requires special equipment and caution. First, the condition of the pipes must be checked, then chemical means and mechanical cleaning methods are used. If necessary, we may need to use special machines. The process is completed by flushing the pipes.

Water cannon
With a high-pressure water jet, sewer pipes are cleaned from sediment and various clogs. This method is especially effective for removing fatty deposits and completely cleaning the pipes.
- high blood pressure
- Getting rid of fat
- Quick effect
Electric rope
With a special electric trowel, it is possible to get rid of difficult clogs that cannot be cleaned with a water jet. The rope is equipped with various equinoxes, which allow us to decompose and remove solid waste.
- Equinoxes of different sizes
- Getting rid of hard blockages
- Safe method
Cleaning the well
Cleaning the sewage wells includes pumping out the sediment, washing the walls and disinfecting them. The process is completed using special equipment, which ensures complete cleaning and sanitary treatment of the well.
- Pumping
- Disinfection
- Getting rid of the smell
Cleaning the toilet
The toilet is cleaned with special means that remove calcareous deposits and spew bacteria. The process involves cleaning both the visible part and the internal pipes from blockages.
- Getting rid of limescale
- Antibacterial treatment
- Cleaning the siphon
Wiring
Complete diagnostics and cleaning of the sewage wiring system. We use modern video inspection systems to identify problem areas and plan further cleaning work.
- Video diagnostics
- Leak detection
- Preventive services
Replacement/removal of sewer pipes
We carry out a complete installation of the sewage system and the replacement of old pipes with new ones. We use only high-quality pipes, which ensures a long and trouble-free operation of the system.
- Installation of pipes - professional crew
- Quality of material - 25 years warranty period
- Planning and design - free consultation
- Warranty service - 2 years
- Installation of a new system - 3-5 working days